| 404226694 | Form 17 | 5/28/2025 | 6/3/2025 | PLUNGER LIFT | 92 | CONTINUOUS | GAS | 0 | NO FLOW | 162 | 167 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403791428 | Form 17 | 5/14/2024 | 5/15/2024 | PLUNGER LIFT | 78 | CONTINUOUS | GAS | 0 | NO FLOW | 168 | 169 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/15/2023 | 7/17/2023 | Plunger Lift | 45 | N/A | -- | 0 | No Flow | 200 | 204 | No | No | No | 2" valve |
| Click for Specifics | Full | 3/18/2022 | 4/18/2022 | Clock/Intermitter | 72 | N/A | -- | 72 | N/A | 197 | 199 | No | No | No | tied into tubing |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Flowing | 78 | N/A | -- | 91 | No Flow | 206 | 210 | No | No | No | Tied into flowline. |
| 402493698 | Form 17 | 9/18/2020 | 9/21/2020 | SHUT-IN | 172 | GAS | -- | 0 | VAPOR | 195 | 198 | No | -- | -- | Bradenhead tested with flow meter and was 1.8 mcf a day. Branden head left open per Craig Burger's under 2 mcf a day rule. |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/13/2017 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/26/2005 | 6/2/2020 | | 5 | | | 0 | | -- | -- | No | No | No | |