| 404172796 | Form 17 | 4/21/2025 | 4/21/2025 | CLOCK/INTERMITTER | 89 | CONTINUOUS | GAS | 0 | NO FLOW | 81 | 99 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403804126 | Form 17 | 5/24/2024 | 5/28/2024 | CLOCK/INTERMITTER | 81 | CONTINUOUS | GAS | 0 | NO FLOW | 77 | 100 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/21/2023 | 7/17/2023 | Clock/Intermitter | 42 | N/A | -- | 42 | N/A | 110 | 124 | No | No | No | tied in |
| 403047989 | Form 17 | 5/3/2022 | 5/12/2022 | CLOCK/INTERMITTER | 229 | CONTINUOUS | GAS | 0 | NO FLOW | 103 | 136 | No | -- | -- | |
| 403006147 | Form 17 | 4/5/2022 | 4/6/2022 | CLOCK/INTERMITTER | 231 | CONTINUOUS | GAS | 0 | NO FLOW | 127 | 138 | No | -- | -- | Test performed through 2" valve |
| Click for Specifics | Full | 2/25/2022 | 3/7/2022 | Clock/Intermitter | 225 | N/A | -- | 0 | No Flow | 113 | 92 | No | No | No | 2 inch ball valve |
| Click for Specifics | Full | 6/3/2021 | 7/12/2021 | Shut-In | 144 | N/A | -- | 0 | Down to Zero | 195 | 208 | No | No | No | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 2 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 4/8/2005 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 8/17/2003 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |