| 404184715 | Form 17 | 4/29/2025 | 4/30/2025 | PLUNGER LIFT | 311 | CONTINUOUS | GAS | 0 | NO FLOW | 145 | 134 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403810877 | Form 17 | 5/30/2024 | 6/3/2024 | PLUNGER LIFT | 322 | NO FLOW | NONE | 0 | NO FLOW | 143 | 152 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403372429 | Form 17 | 4/10/2023 | 4/13/2023 | PLUNGER LIFT | 334 | CONTINUOUS | GAS | 0 | NO FLOW | 149 | 156 | No | -- | -- | This is an annual bradenhead test that was performed on day six of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2" valve. |
| Click for Specifics | Full | 3/15/2023 | 4/10/2023 | Plunger Lift | 155 | N/A | -- | 0 | No Flow | 144 | 152 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 10/25/2022 | 11/8/2022 | Plunger Lift | 170 | N/A | -- | 0 | No Flow | 158 | 162 | No | No | No | |
| Click for Specifics | Full | 6/2/2021 | 7/12/2021 | Plunger Lift | 466 | N/A | -- | 0 | Continuous | 151 | 158 | No | No | No | |
| 402713291 | Form 17 | 6/2/2021 | 6/9/2021 | PLUNGER LIFT | 466 | CONTINUOUS | GAS | 16 | CONTINUOUS | 151 | 158 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 408 | | -- | -- | No | No | No | |