| 404549353 | Form 17 | 2/16/2026 | 2/18/2026 | PLUNGER LIFT | 166 | CONTINUOUS | GAS | 0 | WHISPER | 168 | 169 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. This well has an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 404104363 | Form 17 | 2/24/2025 | 2/24/2025 | CLOCK/INTERMITTER | 172 | WHISPER | GAS | 0 | WHISPER | 114 | 114 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 403820667 | Form 17 | 6/10/2024 | 6/11/2024 | PLUNGER LIFT | 173 | CONTINUOUS | GAS | 0 | WHISPER | 117 | 116 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403307809 | Form 17 | 1/31/2023 | 1/31/2023 | CLOCK/INTERMITTER | 165 | CONTINUOUS | GAS | 0 | WHISPER | 115 | 115 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. |
| Click for Specifics | Full | 2/22/2022 | 3/7/2022 | Clock/Intermitter | 155 | N/A | -- | 0 | Whisper | 135 | 135 | No | No | No | 1/2 blowdown, 7 day build up |
| 402757159 | Form 17 | 7/21/2021 | 7/22/2021 | CLOCK/INTERMITTER | 245 | CONTINUOUS | WATER AND GAS | 2 | WHISPER | 141 | 142 | No | -- | -- | |
| Click for Specifics | Full | 6/2/2021 | 7/12/2021 | Plunger Lift | 200 | N/A | -- | 1 | Whisper | 145 | 145 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |