| 404110757 | Form 17 | 2/26/2025 | 2/28/2025 | PLUNGER LIFT | 141 | CONTINUOUS | GAS | 0 | WHISPER | 188 | 193 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403892264 | Form 17 | 8/14/2024 | 8/16/2024 | PLUNGER LIFT | 157 | CONTINUOUS | GAS | 0 | WHISPER | 187 | 188 | No | -- | -- | This is an annual bradenhead test that was performed on Day Five of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403317017 | Form 17 | 2/8/2023 | 2/9/2023 | PLUNGER LIFT | 167 | CONTINUOUS | GAS | 0 | NO FLOW | 142 | 153 | No | -- | -- | Test was performed through a 2" valve. |
| Click for Specifics | Full | 2/23/2022 | 3/7/2022 | Plunger Lift | 108 | N/A | -- | 0 | No Flow | 138 | 138 | No | No | No | 2" blow down |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Shut-In | 148 | N/A | -- | 0 | Down to Zero | 135 | 141 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/13/2001 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |
| Click for Specifics | Light | 4/29/2001 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |