WELL05-045-07123CLOUGH
RMV 202-20
TEP ROCKY MOUNTAIN LLC
96850
PR
1/10/1997
RULISON
75400
GARFIELD  045
SWNE 20 6S94W 6
335273
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 600 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404143779Form 173/26/20253/27/2025SHUT-IN191CONTINUOUS GAS0 NO FLOW 137137No----This is an annual bradenhead test that was performed on day one of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve.
403804828Form 175/24/20245/28/2024PLUNGER LIFT191NO FLOW NONE0 NO FLOW 140142No----This is an annual bradenhead test that was performed on Day One of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve.
403397180Form 175/3/20235/8/2023PLUNGER LIFT193CONTINUOUS GAS0 DOWN TO 0 135136No----This is an annual bradenhead test that was performed after one day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve.
Click for SpecificsFull2/17/20233/15/2023Plunger Lift165N/A--0No Flow136136NoNoNo2" blowdown
403138870Form 178/15/20228/17/2022PLUNGER LIFT206CONTINUOUS GAS0 WHISPER 147140No----Annual bradenhead test performed on day six of a seven day shut-in, as the surface casing reached the threshold pressure on the sixth day. The bradenhead is connected to the sales line with an approved PMP. Test performed through a 1/2" valve.
Click for SpecificsFull6/2/20217/12/2021Plunger Lift201N/A--0Continuous141139NoNoNo 
402713064Form 176/2/20216/9/2021PLUNGER LIFT201CONTINUOUS GAS0 NO FLOW 141139No---- 