| 404152322 | Form 17 | 3/31/2025 | 4/3/2025 | CLOCK/INTERMITTER | 227 | CONTINUOUS | GAS | 0 | WHISPER | 98 | 104 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403823028 | Form 17 | 6/7/2024 | 6/12/2024 | CLOCK/INTERMITTER | 238 | NO FLOW | NONE | 0 | WHISPER | 110 | 105 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403372331 | Form 17 | 4/11/2023 | 4/13/2023 | CLOCK/INTERMITTER | 242 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 106 | 108 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/16/2023 | 3/15/2023 | Shut-In | 118 | N/A | -- | 0 | No Flow | 99 | 107 | No | No | No | 1/2" blowdown |
| 403111184 | Form 17 | 7/20/2022 | 7/20/2022 | PLUNGER LIFT | 245 | CONTINUOUS | GAS | 52 | CONTINUOUS | 122 | 116 | No | -- | -- | Annual bradenhead test performed after five days of a seven day shut-in, as the surface casing reached the threshold
pressure on the fifth day. The bradenhead is connected to the sales line with an approved PMP. Test performed
through a 1/2" valve.
|
| Click for Specifics | Full | 5/27/2021 | 6/7/2021 | Clock/Intermitter | 305 | N/A | -- | 0 | Continuous | 115 | 119 | No | No | No | |
| 402712651 | Form 17 | 5/27/2021 | 6/9/2021 | CLOCK/INTERMITTER | 305 | CONTINUOUS | GAS | 14 | CONTINUOUS | 115 | 119 | No | -- | -- | **Test data was previously submitted via the bulk upload tool. |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 215 | | -- | -- | No | No | No | |