BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-045-07093CLOUGH
RMV 66-20
TEP ROCKY MOUNTAIN LLC
96850
PR
12/19/1996
RULISON
75400
GARFIELD  045
NESE 20 6S94W 6
335272
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 511 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404152164Form 173/31/20254/3/2025PLUNGER LIFT166CONTINUOUS GAS0 NO FLOW 124126No----This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve.
403810885Form 175/30/20246/3/2024PLUNGER LIFT165NO FLOW NONE0 NO FLOW 130128No----This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve.
403473723Form 177/21/20237/24/2023PLUNGER LIFT130CONTINUOUS GAS0 NO FLOW 130131No----This well has an approved PMP and the bradenhead is connected to the flowline. The bradenhead pressure was below the threshold pressure at the time of this test. The test was performed through a 2" valve.
403366292Form 174/5/20234/5/2023PLUNGER LIFT161CONTINUOUS GAS0 DOWN TO 0 131131No----This is an annual bradenhead test that was performed on the second day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve.
Click for SpecificsFull2/17/20233/15/2023Plunger Lift133N/A--0Down to Zero234264NoNoNo2" blowdown
403108863Form 177/18/20227/18/2022PLUNGER LIFT161CONTINUOUS GAS0 WHISPER 132131No----Annual bradenhead test performed after three days of a seven day shut-in. The surface casing reached the threshold pressure on the third day. The bradenhead is connected to the sales line with an approved PMP. Test performed through a 1/2" valve.
Click for SpecificsFull6/2/20217/12/2021Plunger Lift154N/A--0Continuous137137NoNoNo 
402713432Form 176/2/20216/9/2021PLUNGER LIFT154CONTINUOUS GAS4 CONTINUOUS 137137No---- 
Click for SpecificsLight10/1/20156/2/2020 --  135 ----NoNoNo