| 404209404 | Form 17 | 5/15/2025 | 5/19/2025 | PLUNGER LIFT | 190 | CONTINUOUS | GAS | 0 | WHISPER | 201 | 203 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403906331 | Form 17 | 8/29/2024 | 8/30/2024 | PLUNGER LIFT | 197 | CONTINUOUS | GAS | 0 | WHISPER | 210 | 213 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403291257 | Form 17 | 1/10/2023 | 1/16/2023 | PLUNGER LIFT | 114 | CONTINUOUS | GAS | 0 | WHISPER | 205 | 205 | No | -- | -- | Test was performed through a 2" valve. |
| Click for Specifics | Full | 3/18/2022 | 4/18/2022 | Plunger Lift | 92 | N/A | -- | 90 | N/A | 132 | 130 | No | No | No | Tied in |
| Click for Specifics | Full | 8/16/2021 | 9/6/2021 | Plunger Lift | 123 | N/A | -- | 121 | N/A | 166 | 167 | No | No | No | Bradenhead line is tied into the tubing line |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 290 | | -- | -- | No | No | No | |