| 404152332 | Form 17 | 3/31/2025 | 4/3/2025 | SHUT-IN | 114 | CONTINUOUS | GAS | 0 | WHISPER | 98 | 98 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403810883 | Form 17 | 5/30/2024 | 6/3/2024 | CLOCK/INTERMITTER | 116 | NO FLOW | NONE | 0 | WHISPER | 105 | 104 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403372321 | Form 17 | 4/11/2023 | 4/13/2023 | PLUNGER LIFT | 121 | CONTINUOUS | GAS | 0 | WHISPER | 100 | 101 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 2/17/2023 | 3/15/2023 | Clock/Intermitter | 106 | N/A | -- | 0 | No Flow | 105 | 105 | No | No | No | 1/2" blowdown |
| 403139887 | Form 17 | 8/17/2022 | 8/18/2022 | CLOCK/INTERMITTER | 134 | CONTINUOUS | GAS | 1 | CONTINUOUS | 112 | 112 | No | -- | -- | Annual bradenhead test performed after a seven day shut-in. The bradenhead is connected to the sales line with an
approved PMP. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 6/2/2021 | 7/12/2021 | Clock/Intermitter | 157 | N/A | -- | 0 | Whisper | 112 | 112 | No | No | No | |
| 402713443 | Form 17 | 6/2/2021 | 6/9/2021 | CLOCK/INTERMITTER | 157 | CONTINUOUS | GAS | 2 | WHISPER | 112 | 112 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 150 | | -- | -- | No | No | No | |