| Click for Specifics | Full | 3/25/2025 | 4/7/2025 | | 35 | N/A | -- | 0 | No Flow | 159 | 130 | No | No | No | 2'' blowdown. Cycled during test. 1/2'' blowdown on Intermediate. |
| Click for Specifics | Full | 3/11/2024 | 6/18/2024 | | 18 | N/A | -- | 0 | No Flow | 155 | 123 | No | No | No | 2" valve |
| 403507853 | Form 17 | 8/24/2023 | 8/24/2023 | PLUNGER LIFT | 32 | CONTINUOUS | GAS | 0 | NO FLOW | 150 | 155 | No | -- | -- | This Form 17 is being submitted to satisfy a COA that was attached to a recent Form 4 (403447725) approval. The bradenhead test was performed through a 2" valve and intermediate casing test was performed through a 1/2" valve. |
| Click for Specifics | Full | 6/27/2023 | 7/17/2023 | Plunger Lift | 34 | N/A | -- | 0 | No Flow | 148 | 154 | No | No | No | BH / 2in Blowdown INT / 1/2 Blowdown and Tied in to flow line |
| Click for Specifics | Full | 3/11/2022 | 4/18/2022 | Plunger Lift | 51 | N/A | -- | 51 | N/A | 188 | 191 | No | No | No | Tied in |
| Click for Specifics | Full | 7/6/2021 | 8/9/2021 | Plunger Lift | 198 | N/A | -- | 10 | Continuous | 125 | 136 | No | No | No | |
| 402739281 | Form 17 | 7/6/2021 | 7/7/2021 | PLUNGER LIFT | 198 | CONTINUOUS | GAS | 17 | CONTINUOUS | 125 | 136 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |