| Click for Specifics | Light | 10/14/2025 | 11/5/2025 | | 9 | | -- | 0 | | 160 | 160 | No | No | No | |
| Click for Specifics | Light | 9/11/2024 | 10/22/2024 | | 10 | | -- | 0 | | 172 | 172 | No | No | No | |
| Click for Specifics | Light | 9/7/2023 | 10/9/2023 | Flowing | 20 | | -- | 0 | | 248 | 248 | No | No | No | |
| Click for Specifics | Light | 11/7/2022 | 12/19/2022 | Flowing | 22 | | -- | 0 | | 199 | 199 | No | No | No | |
| 402775517 | Form 17 | 8/5/2021 | 8/11/2021 | FLOWING | 24 | DOWN TO 0 | GAS | 0 | NO FLOW | 202 | 204 | No | -- | -- | 24 psig initial surface casing pressure. No samples taken. |
| 402469061 | Form 17 | 8/11/2020 | 8/20/2020 | FLOWING | 53 | CONTINUOUS | -- | 0 | NO FLOW | 162 | 169 | Yes | Yes | No | annual test - will be opened back up to current mitigation plan and continue with annual testing
SCP = 53, TP/CP = 135/162 gas sample |
| Click for Specifics | Full | 12/12/2019 | 12/24/2019 | | 101 | Continuous Flow | -- | 5 | Continuous Flow | 163 | 166 | Yes | Yes | No | |