Click for Specifics | Light | 9/18/2024 | 10/22/2024 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
Click for Specifics | Light | 8/18/2023 | 9/25/2023 | Shut-In | 0 | | -- | 0 | | 13 | 13 | No | No | No | |
Click for Specifics | Light | 9/27/2022 | 10/10/2022 | Shut-In | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
Click for Specifics | Light | 8/20/2021 | 9/13/2021 | Shut In | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
402561689 | Form 17 | 12/28/2020 | 12/29/2020 | SHUT-IN | 1 | DOWN TO 0 | GAS | 0 | NO FLOW | -4 | -4 | No | -- | -- | 1 psig. initial surface casing pressure. No samples taken. |
402232522 | Form 17 | 10/31/2019 | 11/6/2019 | | -5 | DOWN TO 0 | -- | 0 | DOWN TO 0 | 0 | 0 | No | -- | -- | Filed as part the annual test requirements. See attached P17 form filled out during tests, attached.
|
401396749 | Form 17 | 9/5/2017 | 9/28/2017 | SHUT-IN | -3 | DOWN TO 0 | -- | 0 | DOWN TO 0 | 200 | 200 | No | -- | -- | |
401396748 | Form 17 | 9/5/2017 | 9/7/2017 | SHUT-IN | -3 | NO FLOW | -- | 0 | NO FLOW | 200 | 200 | No | -- | -- | Bradenhead Test -Within 60 days of rig release, prior to stimulation. |