| Click for Specifics | Full | 11/6/2025 | 11/17/2025 | | 0 | No Flow | -- | 0 | No Flow | 828 | 828 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/14/2025 | 3/4/2025 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403896515 | Form 17 | 8/14/2024 | 8/21/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 403675334 | Form 17 | 2/1/2024 | 2/2/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 403496602 | Form 17 | 8/4/2023 | 8/15/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 404227979 | Form 17 | 5/20/2023 | 6/3/2025 | GAS LIFT | 1 | WHISPER | GAS | 1 | WHISPER | 0 | 0 | No | -- | -- | Post-Production within 60 days of first sales. 1 PSI whisper gas flow blew did not blow down after thirty minutes, whisper gas observed throughout entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |