| Click for Specifics | Full | 10/9/2025 | 10/22/2025 | | 2 | Down to Zero | -- | 0 | No Flow | 448 | 450 | No | No | No | Annual Test. 2 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/12/2024 | 4/16/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 466 | 465 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/12/2023 | 6/20/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 579 | 578 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 10/17/2022 | 11/8/2022 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 470 | 469 | No | None | None | |
| Click for Specifics | Light | 10/28/2021 | 11/1/2021 | Flowing | 0 | | -- | 0 | | 349 | 349 | No | No | No | Test per NTO. Vacuum on open for 25 seconds. |
| 402301351 | Form 17 | 1/28/2020 | 2/3/2020 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 94 | 84 | No | -- | -- | Test after DOFP. BH had slight vacuum on open. |
| 402272556 | Form 17 | 12/12/2019 | 12/27/2019 | SHUT-IN | 5 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |