| Click for Specifics | Full | 10/24/2025 | 10/27/2025 | | 0 | No Flow | -- | 0 | No Flow | 322 | 323 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/12/2024 | 4/16/2024 | | 2 | Down to Zero | -- | 0 | Down to Zero | 456 | 462 | No | No | No | Annual Test. 2 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/30/2023 | 6/5/2023 | Flowing | 0 | Down to Zero | -- | 0 | Down to Zero | 816 | 816 | No | None | None | |
| 403265434 | Form 17 | 12/19/2022 | 12/19/2022 | FLOWING | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 1884 | 1884 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403177487 | Form 17 | 9/23/2022 | 9/26/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |