| 404225747 | Form 17 | 5/13/2025 | 6/2/2025 | PLUNGER LIFT | 6 | CONTINUOUS | GAS | 0 | NO FLOW | 952 | 952 | No | -- | -- | Remediation follow up test. 6 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403931868 | Form 17 | 9/23/2024 | 9/24/2024 | FLOWING | 70 | CONTINUOUS | GAS | 0 | WHISPER | 2668 | 2663 | No | -- | -- | Post-Production test within 60 days of first sales. 70 PSI gas flow blew down to 0 PSI within first minute of test, whisper gas and fluid stream for remainder of test, ~1.25 gallons total fluid. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403701540 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |