| 404414204 | Form 17 | 10/27/2025 | 10/29/2025 | FLOWING | 62 | CONTINUOUS | GAS | 0 | NO FLOW | 627 | 627 | No | -- | -- | High Pressure Verification Test. 62 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| 404225459 | Form 17 | 5/13/2025 | 6/2/2025 | PLUNGER LIFT | 9 | CONTINUOUS | GAS | 0 | NO FLOW | 845 | 843 | No | -- | -- | Remediation follow up test. 9 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403963742 | Form 17 | 10/18/2024 | 10/21/2024 | FLOWING | 52 | CONTINUOUS | WATER AND LIQUID HYDROCARBON | 1 | WHISPER | 1953 | 1952 | No | -- | -- | Post-Production within 60 days of first sales. 52 PSI fluid flow blew down to 1 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403701535 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |