| 404222499 | Form 17 | 5/15/2025 | 5/29/2025 | PLUNGER LIFT | 14 | CONTINUOUS | GAS | 0 | NO FLOW | 913 | 913 | No | -- | -- | Remediation follow up test. 14 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403960884 | Form 17 | 10/15/2024 | 10/17/2024 | FLOWING | 101 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 2300 | 2267 | No | -- | -- | Post-Production test within 60 days of first sales. 101 PSI water and gas flow down to 0 PSI within first minute of test, water trickled for the remainder of the test, ~1 gallon total fluid. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403701570 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |