| Click for Specifics | Light | 4/3/2025 | 4/14/2025 | | 0 | | -- | 0 | | 971 | 971 | No | No | No | |
| 403964627 | Form 17 | 10/21/2024 | 10/21/2024 | FLOWING | 6 | DOWN TO 0 | GAS | 0 | NO FLOW | 2024 | 2023 | No | -- | -- | Post-Production test within 60 days of first sales. 6 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403701589 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |