| 404225400 | Form 17 | 5/13/2025 | 6/2/2025 | PLUNGER LIFT | 4 | CONTINUOUS | GAS | 0 | NO FLOW | 889 | 889 | No | -- | -- | Remediation follow up test. 4 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403923707 | Form 17 | 9/16/2024 | 9/17/2024 | FLOWING | 80 | CONTINUOUS | GAS | 0 | NO FLOW | 2584 | 2583 | No | -- | -- | Post-Production test within 60 days of first sales. 80 PSI blew down to 0 PSI within first 5 minutes of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403701520 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |