| 404218722 | Form 17 | 5/9/2025 | 5/27/2025 | FLOWING | 4 | DOWN TO 0 | GAS | 0 | NO FLOW | 885 | 885 | No | -- | -- | Remediation follow up test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403963759 | Form 17 | 10/18/2024 | 10/21/2024 | FLOWING | 53 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 2857 | 2857 | No | -- | -- | Post-Production test within 60 days of first sales. 53 PSI water and gas flow blew down to 0 PSI in seconds, water continued to trickle for entire test, ~ 1 gallon total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403701642 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |