| 404211474 | Form 17 | 5/9/2025 | 5/20/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 865 | 865 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403931935 | Form 17 | 9/23/2024 | 9/24/2024 | FLOWING | 56 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 2859 | 2854 | No | -- | -- | Post-Production test within 60 days of first sales. 56 PSI gas and water blew down to 0 PSI within first minute of test, whisper gas and slight fluid present for the remainder of the test, ~2.5 gallons total fluid. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403701638 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |