| 404225915 | Form 17 | 5/13/2025 | 6/2/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 881 | 881 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403963754 | Form 17 | 10/18/2024 | 10/21/2024 | FLOWING | 92 | CONTINUOUS | WATER AND LIQUID HYDROCARBON | 1 | WHISPER | 2186 | 2187 | No | -- | -- | Post-Production within 60 days of first sales. 92 PSI fluid flow blew down to 1 PSI in 30 minutes, ~2.5 gallons total fluid. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403701583 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |