| 404222592 | Form 17 | 5/15/2025 | 5/29/2025 | PLUNGER LIFT | 1 | CONTINUOUS | GAS | 0 | NO FLOW | 802 | 802 | No | -- | -- | Remediation follow up test. 1 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403960919 | Form 17 | 10/4/2024 | 10/17/2024 | FLOWING | 66 | CONTINUOUS | GAS | 0 | NO FLOW | 2619 | 2618 | No | -- | -- | Post-Production test within 60 days of first sales. 66 PSI gas flow blew down to 0 PSI within first 5 minutes of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403701609 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |