| 404222572 | Form 17 | 5/15/2025 | 5/29/2025 | PLUNGER LIFT | 4 | CONTINUOUS | GAS | 0 | NO FLOW | 829 | 829 | No | -- | -- | Remediation follow up test. 4 PSI gas blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403963757 | Form 17 | 10/18/2024 | 10/21/2024 | FLOWING | 107 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 2307 | 2208 | No | -- | -- | Post-Production within 60 days of first sales. 107 PSI fluid flow, gas on open, blew down to 3 PSI in 30 minutes, ~1 gallon black fluid. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403701592 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |