| 404222160 | Form 17 | 5/14/2025 | 5/29/2025 | FLOWING | 10 | DOWN TO 0 | GAS | 0 | NO FLOW | 777 | 776 | No | -- | -- | Remediation follow up test. 10 PSI gas blew down to 0 in first few seconds. No pressure or flow observed for remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403964728 | Form 17 | 10/21/2024 | 10/21/2024 | FLOWING | 52 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 2095 | 2095 | No | -- | -- | Post-Production test within 60 days of first sales. 52 PSI water and gas flow blew down to 0 PSI in seconds, water continued to trickle for entire test, ~1 gallon total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403826830 | Form 17 | 6/10/2024 | 6/17/2024 | SHUT-IN | 56 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 56 PSI gas flow blew down to 0 PSI in 5 minutes. No pressure or flow observed for the remainder of the test. |
| 403701596 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |