| 404218745 | Form 17 | 5/9/2025 | 5/27/2025 | FLOWING | 9 | DOWN TO 0 | GAS | 0 | NO FLOW | 957 | 957 | No | -- | -- | Remediation follow up test. 9 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403963768 | Form 17 | 10/18/2024 | 10/21/2024 | FLOWING | 53 | CONTINUOUS | WATER AND GAS | 1 | WHISPER | 3207 | 3205 | No | -- | -- | Post-Production test within 60 days of first sales. 53 PSI continuous whisper gas and slight fluid flow blew down to 1 PSI in thirty minutes, ~3.75 gallons fluid. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403701644 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |