| 404222607 | Form 17 | 5/15/2025 | 5/29/2025 | PLUNGER LIFT | 7 | CONTINUOUS | GAS | 0 | NO FLOW | 833 | 834 | No | -- | -- | Remediation follow up test. 7 PSI whisper blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403984599 | Form 17 | 11/4/2024 | 11/6/2024 | | 40 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 1969 | 1977 | No | -- | -- | Post-Production within 60 days of first sales. 40 PSI water and gas blew down to 0 PSI in 30 minutes, whisper gas and water observed throughout the entire test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403701632 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |