| 404225878 | Form 17 | 5/13/2025 | 6/2/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 1072 | 1072 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403960997 | Form 17 | 10/15/2024 | 10/17/2024 | FLOWING | 135 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 2301 | 2300 | No | -- | -- | Post-Production test within 60 days of first sales. 135 PSI water and gas flow blew down to 0 PSI in seconds, water continued to trickle for entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403701568 | Form 17 | 2/24/2024 | 2/28/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |