| Click for Specifics | Full | 9/8/2025 | 9/15/2025 | | 0 | No Flow | -- | 0 | No Flow | 740 | 740 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 3/24/2025 | 3/31/2025 | | 1 | | -- | 0 | | 865 | 865 | No | No | No | |
| 403895713 | Form 17 | 8/12/2024 | 8/21/2024 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 1804 | 1805 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403589887 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |