| Click for Specifics | Full | 9/24/2025 | 9/29/2025 | | 26 | Continuous | -- | 0 | No Flow | 670 | 669 | No | No | No | Annual Test. 26 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404329062 | Form 17 | 8/7/2025 | 8/25/2025 | PLUNGER LIFT | 57 | CONTINUOUS | LIQUID HYDROCARBON | 0 | NO FLOW | 687 | 684 | No | -- | -- | Engineering Ad Hoc test. 57 PSI liquid hydrocarbons blew down to 0 PSI within 5 minutes. No pressure or flow observed for the remainder of test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| Click for Specifics | Light | 3/24/2025 | 3/31/2025 | | 0 | | -- | 0 | | 818 | 819 | No | No | No | |
| 403876420 | Form 17 | 7/29/2024 | 8/5/2024 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 2178 | 2177 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403589836 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |