| 404499683 | Form 17 | 1/6/2026 | 1/8/2026 | FLOWING | 140 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 531 | 530 | No | -- | -- | |
| 404381353 | Form 17 | 9/24/2025 | 10/7/2025 | PLUNGER LIFT | 90 | SURGE | WATER AND GAS | 0 | NO FLOW | 735 | 735 | No | -- | -- | Annual Test. 90 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404072202 | Form 17 | 1/9/2025 | 1/28/2025 | FLOWING | 8 | WHISPER | GAS | 0 | NO FLOW | 963 | 965 | No | -- | -- | Remediation follow up test. 8 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403879622 | Form 17 | 8/5/2024 | 8/7/2024 | FLOWING | 112 | CONTINUOUS | WATER AND LIQUID HYDROCARBON | 0 | WHISPER | 2019 | 2013 | No | -- | -- | Post-Production test within 60 days of first sales. 112 PSI oily fluid and gas flow on open turned to water and blew down to 0 PSI in 3 minutes. Whisper gas flow and fluid trickle for remainder of test, ~2.5 gallons total fluid. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403589883 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |