| 404505566 | Form 17 | 1/7/2026 | 1/14/2026 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 498 | 495 | No | -- | -- | |
| Click for Specifics | Full | 9/24/2025 | 9/29/2025 | | 0 | No Flow | -- | 0 | No Flow | 773 | 772 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404286101 | Form 17 | 7/1/2025 | 7/18/2025 | FLOWING | 54 | DOWN TO 0 | GAS | 0 | NO FLOW | 825 | 825 | No | -- | -- | Engineering Ad Hoc test. 54 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| 404104816 | Form 17 | 2/13/2025 | 2/24/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 1170 | 1159 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403863515 | Form 17 | 7/17/2024 | 7/23/2024 | | 138 | DOWN TO 0 | GAS | 0 | NO FLOW | 2505 | 2504 | No | -- | -- | Post-Production within 60 days of first sales. 138 PSI whisper gas blew down to 0 PSI in 30 seconds. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403589838 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |