| 404385877 | Form 17 | 10/3/2025 | 10/9/2025 | FLOWING | 98 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 699 | 700 | No | -- | -- | High Pressure Verification Test. 98 PSI gas and water blew down to 0 PSI within first few seconds, water observed for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| Click for Specifics | Full | 9/8/2025 | 9/15/2025 | | 6 | Continuous | -- | 0 | No Flow | 725 | 725 | No | No | No | Annual Test. 6 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 3/24/2025 | 3/31/2025 | | 11 | | -- | 0 | | 849 | 848 | No | No | No | |
| 403895751 | Form 17 | 8/12/2024 | 8/21/2024 | FLOWING | 8 | DOWN TO 0 | GAS | 0 | NO FLOW | 1914 | 1914 | No | -- | -- | Post-Production test within 60 days of first sales. 8 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403589894 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |