| 404505915 | Form 17 | 1/7/2026 | 1/14/2026 | FLOWING | 7 | DOWN TO 0 | GAS | 0 | NO FLOW | 513 | 516 | No | -- | -- | |
| Click for Specifics | Full | 9/24/2025 | 9/29/2025 | | 13 | Continuous | -- | 0 | No Flow | 775 | 778 | No | No | No | Annual Test. 13 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404072093 | Form 17 | 1/9/2025 | 1/28/2025 | FLOWING | 4 | WHISPER | GAS | 0 | NO FLOW | 916 | 916 | No | -- | -- | Remediation follow up test. 4 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403877137 | Form 17 | 7/29/2024 | 8/5/2024 | FLOWING | 78 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 2508 | 2547 | No | -- | -- | Post-Production within 60 days of first sales. 78 PSI water and gas flow blew down to 0 PSI in first few minutes of test. Water continued to trickle for entire test, ~1 gallon total fluid. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403589856 | Form 17 | 11/7/2023 | 11/8/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |