Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-51789Hen
09N
PDC ENERGY INC
69175
PR
7/12/2024
WATTENBERG
90750
WELD  123
SWNE 8 4N64W 6
482393
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1705 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull9/24/20259/29/2025 38Continuous--0No Flow681682NoNoNoAnnual Test.  38 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
404139191Form 173/10/20253/24/2025FLOWING50DOWN TO 0 WATER AND GAS0 CONTINUOUS 846844No----Remediation follow up test. 50 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test, ~1/2 gal. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403931985Form 179/23/20249/24/2024FLOWING79CONTINUOUS GAS AND LIQUID HYDROCARBON0 WHISPER 14071407No----Annual test. 79 PSI gas and oily black foam flow blew down to 0 PSI in seconds, whisper gas and foam continued to surge for 16 minutes. Whisper gas and liquid hydrocarbon drips for remainder of test, ~1.25 gallons total. PDC will monitor pressure and re-test according to bradenhead policy.
403877158Form 177/29/20248/5/2024FLOWING28DOWN TO 0 GAS0 NO FLOW 22142213No----Post-Production within 60 days of first sales. 28 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test.
403589860Form 1711/7/202311/8/2023SHUT-IN0NO FLOW --0 NO FLOW 00No----Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.