| 404484485 | Form 17 | 12/15/2025 | 12/23/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 650 | 652 | No | -- | -- | |
| Click for Specifics | Full | 5/29/2025 | 6/9/2025 | | 1 | Continuous | -- | 0 | No Flow | 976 | 977 | No | No | No | Annual Test. 1 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404044408 | Form 17 | 12/20/2024 | 12/31/2024 | FLOWING | 51 | CONTINUOUS | GAS | 0 | NO FLOW | 2605 | 2612 | No | -- | -- | Post-Production within 60 days of first sales. 51 PSI blew down to 0 PSI in 10 minutes, continuous/whisper gas present at beginning of test, no pressure or flow observed for remainder of test . PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |