| 404484513 | Form 17 | 12/15/2025 | 12/23/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 707 | 707 | No | -- | -- | |
| Click for Specifics | Full | 5/29/2025 | 6/9/2025 | | 0 | No Flow | -- | 0 | No Flow | 1016 | 1017 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404021326 | Form 17 | 12/6/2024 | 12/9/2024 | FLOWING | 64 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 2697 | 2696 | No | -- | -- | Post-Production within 60 days of first sales. 64 PSI water and gas blew down to 0 PSI in 30 minutes, whisper gas and water trickle observed throughout the entire test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |