| 404565242 | Form 17 | 2/24/2026 | 3/3/2026 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 1000 | 1000 | No | -- | -- | |
| 404291152 | Form 17 | 7/8/2025 | 7/23/2025 | SHUT-IN | 19 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Delayed Completions Test. 19 PSI gas and water blew down to 0 PSI within seconds. Water continued to trickle throughout entire test, ~1 qt. Operator will collect a sample and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404098321 | Form 17 | 2/7/2025 | 2/18/2025 | SHUT-IN | 92 | CONTINUOUS | WATER AND GAS | 1 | CONTINUOUS | 0 | 0 | No | -- | -- | Delayed Completions Test. 92 PSI water and gas blew down to 1 PSI within thirty minutes. Water and gas observed for entire test. Operator will collect a sample and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404096547 | Form 17 | 1/29/2025 | 2/17/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test.
|
| 403905284 | Form 17 | 8/29/2024 | 8/29/2024 | SHUT-IN | 62 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 62 PSI gas flow blew down to 0 PSI in 5 minutes. No pressure or flow observed for the remainder of the test. |
| 403902381 | Form 17 | 8/21/2024 | 8/27/2024 | | 185 | CONTINUOUS | WATER H20 | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Delayed Completions Test. 185 PSI blew down to 0 PSI in 5 minutes, steady trickle of water throughout entire test. PDC will collect a sample and submit results via Form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |