| 404246011 | Form 17 | 5/30/2025 | 6/18/2025 | PLUNGER LIFT | 7 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 1093 | 1093 | No | -- | -- | Remediation follow up test. 7 PSI water flow blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404008842 | Form 17 | 11/25/2024 | 11/26/2024 | FLOWING | 65 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 2753 | 2775 | No | -- | -- | Post-Production within 60 days of first sales. 65 PSI blew down to 0 PSI in 30 minutes, whisper gas and water trickle observed throughout entire test, ~1/2 gal. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |