| Click for Specifics | Full | 2/25/2026 | 3/3/2026 | | 0 | No Flow | -- | 0 | No Flow | 528 | 522 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404058055 | Form 17 | 1/3/2025 | 1/14/2025 | FLOWING | 11 | CONTINUOUS | GAS | 0 | NO FLOW | 1849 | 1851 | No | -- | -- | Post-Production within 60 days of first sales. 11 PSI blew down to 0 PSI within ten minutes of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |