| 404487730 | Form 17 | 12/18/2025 | 12/29/2025 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 7582 | 752 | No | -- | -- | |
| Click for Specifics | Full | 5/29/2025 | 6/9/2025 | | 5 | Continuous | -- | 0 | No Flow | 1102 | 1102 | No | No | No | Annual Test. 5 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404044260 | Form 17 | 12/9/2024 | 12/31/2024 | FLOWING | 70 | CONTINUOUS | GAS | 0 | NO FLOW | 2617 | 2617 | No | -- | -- | Post-Production within 60 days of first sales. 70 PSI strong gas for 1 minute then blew down to 0 PSI after 1 minute, no pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/17/2024 | 6/25/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |