| 404326545 | Form 17 | 8/20/2025 | 8/22/2025 | GAS LIFT | 19 | DOWN TO 0 | NONE | 0 | NO FLOW | 995 | 996 | No | -- | -- | |
| Click for Specifics | Light | 6/4/2024 | 6/10/2024 | | 19 | | -- | 0 | | 967 | 967 | No | No | No | |
| Click for Specifics | Light | 6/26/2023 | 7/3/2023 | Flowing | 19 | | -- | 0 | | 70 | 70 | No | No | No | |
| 403253113 | Form 17 | 12/1/2022 | 12/7/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 2258 | 2258 | No | -- | -- | Post Drilling Bradenhead Test. Casing Pressure is residual from production casing pressure test. |