| 404326547 | Form 17 | 8/20/2025 | 8/22/2025 | GAS LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 841 | 839 | No | -- | -- | |
| Click for Specifics | Light | 6/4/2024 | 6/10/2024 | | 0 | | -- | 0 | | 811 | 813 | No | No | No | |
| Click for Specifics | Light | 6/26/2023 | 7/3/2023 | Flowing | 2 | | -- | 0 | | 933 | 932 | No | No | No | |
| 403253131 | Form 17 | 12/1/2022 | 12/7/2022 | SHUT-IN | 1 | WHISPER | -- | 0 | NO FLOW | 2222 | 2222 | No | -- | -- | Post Drilling Bradenhead Test. Casing Pressure is residual from production casing pressure test. |