Click for Specifics | Light | 6/4/2024 | 6/10/2024 | | 2 | | -- | 0 | | 1028 | 1028 | No | No | No | |
Click for Specifics | Light | 6/26/2023 | 7/3/2023 | Flowing | 9 | | -- | 0 | | 966 | 966 | No | No | No | |
403246113 | Form 17 | 11/30/2022 | 12/1/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 2390 | 2390 | No | -- | -- | Post Drilling bradenhead test. Casing pressure is residual from pre-completion production casing pressure test. |