| 404400465 | Form 17 | 10/14/2025 | 10/22/2025 | PLUNGER LIFT | 79 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 480 | 479 | No | -- | -- | Remediation follow up test. 79 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404043609 | Form 17 | 12/11/2024 | 12/30/2024 | PLUNGER LIFT | 12 | DOWN TO 0 | GAS | 0 | NO FLOW | 627 | 626 | No | -- | -- | Remediation follow up test. 12 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 10/15/2024 | 10/22/2024 | | 9 | Continuous | -- | 0 | No Flow | 672 | 671 | No | No | No | Annual Test. 9 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 11/1/2023 | 11/13/2023 | Flowing | 4 | Down to Zero | -- | 0 | No Flow | 947 | 946 | No | No | No | Annual Test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403250044 | Form 17 | 12/1/2022 | 12/5/2022 | FLOWING | 307 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 2649 | 2648 | Yes | -- | Yes | 30 days of first sales - high pressure follow-up. 307 PSI water and gas flow blew down to 0 PSI within 5 minutes. Water on open, produced ~1.5 gallons and died to drip, 3 gallons total. PDC collected 1000mL water sample and will and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403076349 | Form 17 | 6/10/2022 | 6/13/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |