Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-51454Bost Farm
9N-8B-L
PDC ENERGY INC
69175
PR
12/1/2022
WATTENBERG
90750
GREELEY/WELD  123
Lot2 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1658 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404408409Form 1710/15/202510/27/2025PLUNGER LIFT92DOWN TO 0 WATER H200 CONTINUOUS 415409No----Remediation follow up test. 92 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
404043767Form 1712/11/202412/31/2024PLUNGER LIFT17DOWN TO 0 GAS0 NO FLOW 485487No----Remediation follow up test. 17 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull10/15/202410/22/2024 14Continuous--0No Flow505509NoNoNoAnnual Test.  14 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull12/13/202312/18/2023Flowing23Down to Zero--0Down to Zero723722NoNoNoAnnual Test. 23 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403256681Form 1712/6/202212/12/2022FLOWING379DOWN TO 0 WATER H200 CONTINUOUS 24292428Yes----30 days of first sales - high pressure follow-up. 379 PSI water on open, produced ~1.5 gallons and died to trickle. Collected 1000mL water sample. Water trickle for duration of test, produced ~ 2 gallons total. PDC will monitor pressure and re-test according to bradenhead policy.
403076379Form 176/10/20226/13/2022SHUT-IN0NO FLOW --0 NO FLOW 00No----Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.