| 404399929 | Form 17 | 10/13/2025 | 10/22/2025 | PLUNGER LIFT | 72 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 529 | 531 | No | -- | -- | Remediation follow up test. 72 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404020698 | Form 17 | 12/6/2024 | 12/9/2024 | PLUNGER LIFT | 86 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 570 | 558 | No | -- | -- | Remediation follow up test. 86 PSI continuous gas and water flow blew down to 0 PSI within thirty minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 10/15/2024 | 10/22/2024 | | 6 | Continuous | -- | 0 | No Flow | 595 | 590 | No | No | No | Annual Test. 6 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 12/13/2023 | 12/18/2023 | Flowing | 38 | Down to Zero | -- | 0 | Down to Zero | 858 | 857 | No | No | No | Annual Test. 38 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403250076 | Form 17 | 12/1/2022 | 12/5/2022 | FLOWING | 118 | DOWN TO 0 | MUD | 0 | NO FLOW | 2059 | 2100 | Yes | -- | -- | 30 days of first sales - high pressure follow-up. 118 PSI mud and gas flow blew down to 0 PSI within 5 minutes. Mud on open, produced ~1 gallon and died to drip, 1.25 gallons total. Well pad SI at 13 minute mark and BH flow ceased shortly after. PDC collected 40mL sample and will submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403076372 | Form 17 | 6/10/2022 | 6/13/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |