| 404400295 | Form 17 | 10/14/2025 | 10/22/2025 | PLUNGER LIFT | 68 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 473 | 467 | No | -- | -- | Remediation follow up test. 68 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403956940 | Form 17 | 10/14/2024 | 10/15/2024 | PLUNGER LIFT | 1 | CONTINUOUS | GAS | 0 | NO FLOW | 642 | 643 | No | -- | -- | Remediation follow up test. 1 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 11/14/2023 | 11/22/2023 | Flowing | 13 | Down to Zero | -- | 0 | No Flow | 912 | 912 | No | No | No | Annual Test. 13 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403250003 | Form 17 | 12/1/2022 | 12/5/2022 | FLOWING | 254 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 2212 | 2210 | Yes | -- | -- | 30 days of first sales - high pressure follow-up. 254 PSI water and gas flow blew down to 0 PSI within 5 minutes. Water on open, produced ~2 gallons and died to drip, 2.25 gallons total. PDC collected 1000mL water sample and will and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403076344 | Form 17 | 6/10/2022 | 6/13/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |