Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-51450Bost Farm
16C-8-L
PDC ENERGY INC
69175
PR
11/19/2022
WATTENBERG
90750
GREELEY/WELD  123
Lot2 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1699 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404400295Form 1710/14/202510/22/2025PLUNGER LIFT68DOWN TO 0 WATER H200 CONTINUOUS 473467No----Remediation follow up test. 68 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403956940Form 1710/14/202410/15/2024PLUNGER LIFT1CONTINUOUS GAS0 NO FLOW 642643No----Remediation follow up test. 1 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull11/14/202311/22/2023Flowing13Down to Zero--0No Flow912912NoNoNoAnnual Test. 13 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403250003Form 1712/1/202212/5/2022FLOWING254DOWN TO 0 WATER H200 CONTINUOUS 22122210Yes----30 days of first sales - high pressure follow-up. 254 PSI water and gas flow blew down to 0 PSI within 5 minutes. Water on open, produced ~2 gallons and died to drip, 2.25 gallons total. PDC collected 1000mL water sample and will and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403076344Form 176/10/20226/13/2022SHUT-IN0NO FLOW --0 NO FLOW 00No----Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.